Our projects

PRE COMMISSIONING WORK

(Erection, Testing and Commissioning)

Middle Modi Hydropower Project, 18MW

"Greenvolt Power is appointed as an Electromechanical Installation Contractor for the Installation, Testing, and Commissioning of Powerhouse, Switchyard, and Substation Equipment."

The Middle Modi Hydropower Project, constructed by Middle Modi Hydropower Limited, is located in the Parbat District of Gandaki Province and utilizes the water of the Modi River to generate power of 18 MW. The Project consists of 2 units (9MW x 2) of the Horizontal shaft Francis Turbine. The generated power is evacuated by a 4.5 km long 132kV transmission line to the New Modi Substation.

Dordi Khola Hydropower Project, 12MW

"For the purpose of installing, testing, and commissioning powerhouse, switchyard, and substation equipment, Greenvolt Power was chosen recruited as an electromechanical installation contractor."

Dordi-1 Hydroelectric Project is being developed by Dordi Khola Jal Bidyut Company Ltd (DKJBCL). The project is a Run of River Type Hydropower project with a generating capacity of 12 MW (6MW*2). The project is situated in Dordi gaupaka-6, Lamjung district. There are two horizontal Francis turbines and AC 3-phase synchronous generator with a brushless excitation system. The project evaluates the power through a 3.5 KM long 132kV transmission line to the 132 kV substation at Kirtipur, Lamjung.

Maya Khola Hydropower Project, 16.2MW

"Powerhouse, Switchyard, and Substation Equipment Installation, Testing, and Commissioning are the tasks assigned to Greenvolt Power as an Electromechanical Installation Contractor."

Maya Khola Hydropower Project is situated in Sankhuwasabha district in eastern Nepal, the project is run of river type of capacity of 14.9MW (7.45MW*2).The power plant consists of two horizontal axes and two jet Pelton turbines with a synchronous generator set, which evacuate the power through a 3.4 km long 33 kV transmission line to the NEA substation at Baneshwor.

Karuwaseti Hydropower Project, 32MW

"Greenvolt Power is appointed as an Electromechanical Installation Contractor for the installation, Testing, and Commissioning of Powerhouse, Switchyard, and Substation Equipment."

The Karuwaseti Hydropower project is being developed by the Jhayamolongma Hydro Power Development Pvt. Ltd., which is located at the Kaski district. The project is ROR type with an installed capacity of 32MW. The power house consist of 3 sets of horizontal axis, turbine generator sets and their accessories. The generated power of this plant is evacuated through the 132kV transmission line and finally interconnectedup to the NEA 132 kV at Lahachowk Substation.

POST COMMISSIONING WORK

(Power Plant Operation and Maintainance)

Ghatte Khola Hydropower Project, 5MW

"Greenvolt Power is appointed as the Operation and Maintenance Contractor for this Project."

The Ghatte Khola Hydropower project is located at Marbu, Dolakha district of Bagmati Province. It has a 5 MW (2.5MW*2) of installed capacity. It contains two units of horizontal shaft two jet Pelton turbines as well as the auxiliary units of GLOP, OPU, and cooling system. The plant is operating with a 6.6kV switchgear panel and a 33kV indoor switchyard panel. At the control building, there are several panels TAGP, TLRMP, SGRMP, NGT, LAVT, and AVR which are useful for the plant operation and to take the operational datum. The generated power is evacuated via a 33kV transmission line up to the Singati substation

Middle PHAWA Khola Mini-Hydropower Substation, 500KW

"Greenvolt Power is appointed as the Operation and Maintenance Contractor for this Project."

Middle Phawa Khola mini-hydro subproject is situated in the Taplejung district of koshi. This project was developed by the AEPC/RERL. The Project is targeted to facilitate to 4456 houses by electrification. The power plant has two units of Francis turbine and generator set with auxiliary units of OPU. There are separate generator control and protection panels for the operation and monitoring of the plant. The generated power is evacuated through an 11kV transmission line up to the Taplejung substation.

Giri Khola Mini-Hydro SubProject, 200KW

Giri Khola mini-hydro subproject is located in the Tatopani rural municipality. Jumla district of Karnali province. This project is developed by the AEPC/RERL. The beneficiaries' households are in 2023. The project consists of one unit of 200kW Francis turbine and generator set with auxiliary units of OPU. There are generator control and protection panels for the operation and monitoring of the plant. The generated power is evacuated through an isolated 11kV transmission line.

POST COMMISSIONING WORK

(Repair and Maintainance)

Giri Khola Mini-Hydropower Substation

"Greenvolt Power is appointed as the Repair and Maintenance Contractor for the overall Refurbishment work of Electromechanical Equipment Including the Runner, Labyrinth for the Runner, Guide vane, Shaft Seal, Bearing. Trust Pad, and Draft Tube."

The project was handed over from Giri Khola MHP to the community on December 2020. However, the sub-project was suffering from different problems in its Electro-mechanical Equipment. These problems were unable to be rectified by the operators of the project. To mitigate the issue AEPC/RERL deployed the team from Greenvolt Power Pvt. Ltd. (Consultant) to rectify the cause of the problems. Greenvolt Power Pvt. Ltd. performed various jobs on electrical panels, guide van. Turbine, MIV, generator foundation, and bearing finally the project comes to good operation condition.

Indrawati III HydroPower Project (7.5MW)

Greenvolt Power is appointed as the Repair and Maintenance Contractor for the analysis and debugging of CT PT behavior and to perform the corrective solutions.

Indrawoti III Hydropower Project is located in Sindh upalchwok District. The installed capacity of the project is (2.5MW*3). The plant was having problems in the receiving end substation (66KV) CT PT. A technical team From Greenvolt visited the site, investigated, identified problem and replaced the Old CT PT with a new one.

Simrutu Khola Mini Hydro Substation

Greenvolt Power is appointed as the Repair and Maintenance Contractor for the overall repair maintenance of Electromechanical Equipment Including the Runner, Guide vane. Side Cover. Head Cover, Labyrinth for Runner, Shaft Seal, Bearing. Trust Pad and DraftTube, this Project.

Simrutu Khola Mini Hydropower Project is located in Rukum District near Simrutu Bazaar. The installed capacity is 200KW with one unit. The plant was having problems and officials from RERL approached Greenvolt Power Pvt. Ltd. for the plant solution. A technical team visited the site performed site investigations and did the repair and maintenance of various components such as runner repair, side cover and head cover repair, Labyrinth for a runner, draft tube, guide vane, shaft seal, bearing, thrust pad, and reinstallation of whole EM equipment.